Skip to content
العربيةDesign your flat

From red brick
to the last hidden light.

KASTREL finishes your whole flat under one contract: every trade in the right order, with your materials bought and stored before we start.

Design your flat Book a site visit

Scroll, and the flat is built in front of you

01of 08

  1. 01

    Red brick walls

    The concrete frame, then the bricks, course after course.

  2. 02

    Plumbing, electrics, air-conditioning

    Pipes, conduits and AC lines go inside the walls and the floor, before anything closes over them.

  3. 03

    Plaster and squaring

    Level walls and true corners, so everything after them fits.

  4. 04

    Gypsum board

    Dropped ceilings with the recess for the lights.

  5. 05

    Painting

    Filler and paint in the colours you chose.

  6. 06

    Floors and cladding

    Marble, parquet and porcelain, and wood cladding on the feature wall.

  7. 07

    Doors and windows

    Armoured doors and aluminium windows supplied.

  8. 08

    Hidden lighting

    Profile lights and hidden lights in the skirting and the ceilings. Ready to move in.

The same room, on contract day and on hand-over day.

Drag the gold line to compare.

An illustration of the same room.

Hand-over day
Contract day
Contract dayHand-over day

Every finishing service, in the order of work.

Eighteen services in one contract, from red brick to hand-over. Take all of them, or engineering supervision only over your own craftsmen.

  1. 01Building changes
  2. 02Plumbing and drainage
  3. 03Bathroom and kitchen waterproofing
  4. 04Electrical rough-in
  5. 05Air-conditioning rough-in
  6. 06Plaster and squaring
  7. 07Gypsum board and ceilings
  8. 08Painting and decorative finishes
  9. 09Floors and skirting
  10. 10Wall cladding
  11. 11Doors and windows
  12. 12Hidden lighting
  13. 13Bathroom and kitchen fit-out
  14. 14Kitchens and dressing rooms
  15. 15Villa facades
  16. 16Landscape and gardens
  17. 173D design and technical office
  18. 18Engineering supervision only

All services

And this is our team's real work.

Photos and videos from flats our team has worked on. Tap any one to open it.

Corridor with hidden lights
Corridor with hidden lightsGypsum board and profile lights

Your materials are stored before the first day of work.

As soon as we sign, we buy your flat's materials and store them in your name. If prices rise halfway, your materials are there and your job does not stop.

  • Material prices in the market
  • Yours

An illustration, not real figures.

And work starts right after the contract.

Stored for your flat

Stored for your flat

  • Tiles and marble
  • Cement and gypsum
  • Pipes and cable
  • Gypsum boards
  • Paint
  • Doors and aluminium

Bought on contract day

Red brick wallsPlumbing, electrics, air-conditioningPlaster and squaringGypsum boardPaintingFloors and claddingDoors and windowsHidden lighting

Which one are you?

Four situations with the same answer: one party responsible for the whole job.

A new flat, still red brick

If you're sayingThe wedding is a few months away, the flat is still red brick, and I don't know who to start with.

WeOne team starts right after the contract, with every trade in one order.

Design your flat, then ask for a quote.

Choose the floor, the wall colour and the lights, and turn the flat to see it from every side. Your choices go with your request on WhatsApp.

Floor
Wall colour
Hidden lights
The flat today
Size, roughly 120 m²
Work needed

One contract. Every trade. In the right order. Materials before work. Starting right away.

We are named after the small falcon that holds still in the air however hard the wind blows. Prices move; your job keeps its course.