Skip to content
العربيةDesign your flat

Our team's work.

Photos and videos from flats our team has worked on, sorted by stage. Tap any picture to see it bigger.

Our team's work

Supply pipes with a valve on every line

Our team's work

Bathroom plumbing before the plaster

Our team's work

Bathroom waterproofing flood test

Our team's work

Electrical conduits in the floor

Our team's work

Electrical boxes after the plaster

Our team's work

Gypsum ceiling before paint

Marble reception with wood cladding
Our team's work

Marble reception with wood cladding

Reception with lights in the skirting
Our team's work

Reception with lights in the skirting

Marble hall and lighting
Our team's work

Marble hall and lighting

Parquet hall and chandelier
Our team's work

Parquet hall and chandelier

Long corridor with hidden lights
Our team's work

Long corridor with hidden lights

Our team's work

Corridor with hidden lights

Marble bathroom with a bathtub
Our team's work

Marble bathroom with a bathtub

Bathroom unit and mirror
Our team's work

Bathroom unit and mirror

Marble bathroom
Our team's work

Marble bathroom

Ceiling with light lines
Our team's work

Ceiling with light lines

Wall with gold light lines
Our team's work

Wall with gold light lines

Corridor with a gypsum ceiling
Our team's work

Corridor with a gypsum ceiling

Entrance with an armoured door
Our team's work

Entrance with an armoured door

Our team's work

Door and mouldings

Our team's work

Facade detail with a gold touch

Decorative paint effect
Our team's work

Decorative paint effect

Kitchen and corridor
Our team's work

Kitchen and corridor

Our team's work

Classic facade

Our team's work

Concealed cistern with the plumbing rough-in

Our team's work

A whole flat designed in 3D before work starts

Free site visit and quote

We visit your flat and give you a written quote with every item, and you see your home in 3D before we start.

Ask for a visit on WhatsAppDesign your flat in 3D