Air-conditioning rough-in

Air-conditioning must be prepared early: copper pipes and drain lines go inside the walls before the plaster, so the units go in cleanly later with no pipes on show.

Ask for a visit on WhatsApp

Air-conditioning rough-in
Our team's work
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5
  6. 6
  7. 7
  8. 8
  9. 9
  10. 10
  11. 11
  12. 12
  13. 13
  14. 14
  15. 15
  16. 16
  17. 17
  18. 18

What it includes

  • Insulated copper pipes for each unit
  • AC drain lines to the nearest drain
  • The outdoor unit position
  • A separate power line for each unit
  • Concealed units in the gypsum ceiling if the design has them

Before we close it

  • Pipes are capped and protected before the plaster
  • Drain falls are checked
  • Positions match the design